검색어 입력폼

Delwarca Software Remote Support Unit , queuing

저작시기 2014.08 |등록일 2014.09.18 파일확장자어도비 PDF (pdf) | 26페이지 | 가격 2,500원

목차

1. Indroduction

2. Modelling of Basic Model (Data collection and Issues Raised)
2.1 Operator
2.2 Director Associate
2.3 Associates
2.4 Senior Associates
2.5 Result of Basic Model
2.6 Validation Test

3. Modelling of Alternative Model
3.1 Problem Formulation with Assumptions
3.2 New Approach of the Model
3.3 Training programming of Senior Associates (Brief explanation)
3.3.1 Building Model and Solution
3.4 Training Programming of Associates (Brief Explanation)
3.4.1 Building Model and Solution
3.5 Rescheduling Senior Associates (Brief Explanation)
3.5.1 Building the Model and Solution

4. Conclusion and Recommendation

5. Reference

본문내용

In the Delwarca Software Remote Support Unit, Jack McKinnon considered improving the efficiency and effectively of its calling service in Pre Rapid ID. In addtion, McKnnon improved its customer calling service by Rapid ID. Although the bottleneck of the work to be performed by associates has decreased, the bottleneck of the work to be performed by senior associates has increased dramatically. McKinnon is aware of this problem and has considerable information about the Delwarca company. However, it is difficult for McKinnon to improve the company’s process and to solve its problems.
The basic model in Rapid ID used exponential distribution to explain its operator. In addition, triangular distribution is applied for other activities, such as the director associate and associate, and senior associates. The bottleneck occurs, because the senior associates use more than 80% of the calling service. In addition, this model cannot pass black box validation.

참고 자료

Church.L.K and Uzsoy.R. (2007). Analysis of periodic and eventdriven rescheduling policies in dynamic shops. Taylor Francis Oline. 5 (3), 1~9.
Ford.J.K (2014). Improving training effectiveness in work organisations. East Sussex: Lawrence Erlbaum Associates. 1~2.
Jain.A.K and Elmaraghy.H.A. (2010). Production scheduling/rescheduling in flexible manufacturing. International Journal of Production Research. 35 (1), 281~309.
Oliphant.R.J, shah.J.C and Workman.W. (1989). Method for predictive pacing of calls in a calling system. Rockwell International Corporation. US 07/245,097 (1), 1.
Yamamoto.M and Nof.S.Y. (2007). Scheduling/rescheduling in the manufacturing operating system environment†. International Journal of Production Research. 23 (4), 1~17.
Vieira, G. E, Herrmann.J.W and Lin.E (2003). Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of scheduling 6.1: 3962.