검색어 입력폼

Building Equipment and Systems Design

저작시기 2010.11 |등록일 2011.05.09 파워포인트파일MS 파워포인트 (pptx) | 20페이지 | 가격 1,500원

소개글

한양대 건축설비 2차과제

목차

II. Site Location
III. Drawings
IV. Fire Protection
IV. Fire Protection
IV. Fire Protection
VI. Ventilating System
VI. Ventilating System
VII. Fan Unit

본문내용

Main pump
sub pump
Cooling System, Plumbing
Direct-fired absorption chiller
Refrigerant = Lithium Bromide
Source of Heat = Hot water supplied from
cogeneration plant (about 100°C)
This chiller can heat also, but because of cost,
in winter, the building only uses heat exchanger.
or cold water made by this, is supplied to
ceiling fan of each room to heat or cool.
Cooling System, Plumbing
Chillers based on absorption refrigeration use water as the refrigerant.
In lieu of using a compressor to facilitate alternate evaporating and condensing,
s in the vapor compression cycle, the absorption cycle depends on operation the unit
at near perfect vacuum conditions and on the affinity lithium bromide has for water.
Absorption equipment is factory-evacuated and sealed to preserve the required
vacuum for proper operation.
Cooling System, Plumbing
Heat exchanger
Pump for supplied water
Control panel
Temperature gauge

참고 자료

없음
다운로드 맨위로